Product Added to Cart

Close this pop up to continue shopping
0

TFNU

Your Shopping Cart
Quantity Item Price Total
Thing thing $1.00
Subtotal $0.00
Shipping & Handling $0.00
Current Total $0.00
There are no items in your shopping cart
Placeholder
Alert here

Create an Account

Some text here

Import Trip Plans

You or someone using this computer or device previously created Trip Plans.
What should we do with these plans?
Make these Trip Plans part of my account
Discard these Trip Plans

Login

Some text here

Password Reset

Please enter the email you used to set up your account.
We'll send a link to use to reset your password.

Check Your Email

If there is an account with the email address , we will send you a link to reset your password

Week of April 29th, 2024

Week of April 29th, 2024

Written By Kelli Barkema

April 29

Alyssa reports:

This week we started out at the South end of the BST, at Beus trailhead specifically. Beus Canyon is beautiful this time of year. We worked our way through Beus Canyon trail clearing drains and trimming open blind corners and overgrown areas.

It was in this area that we found an excessively wet segment of trail. Unsure of why the trail was so muddy, we began to investigate what the cause may be. Upon initial inspection it seemed that the spring runoff was raging, as usual in the spring. Upon further inspection, we discovered that there was cut brush, logs, and leaves that had been tossed in the stream. We cleared out the slash and almost immediately the trail thanked us. There was still a little water on the trail though! We managed to locate seeps in the rocky hillside that were also contributing to the dampness. We got to work constructing water bars in the rocky terrain to direct the water off the trail. By the completion of this project the mud had nearly dried up!

After working our way through Beus Canyon we jumped on the BST and began working our way north, continuing to clear and open up drains and trim back overgrown corridors.